top of page

Fairmont Elementary School - WCCUSD

Key Features

  • Plan to demolish existing school buildings and construct five new school buildings

  • Proposed structures vary from 2,000-26,000 square feet in plan dimension 

Geotechnical Challenges

  • Close proximity to Hayward fault

  • Expansive near-surface soils

  • Undocumented fill underlying proposed building locations

  • Buried obstructions and chemically impacted soils

Innovative Solutions

  • Deep foundations extending through unsuitable materials

  • On-site infiltration system designed for storm water run-off

A3GEO, Inc.  
821 Bancroft Way,  Berkeley, CA 94710 

© 2023 by A3GEO, Inc. 

bottom of page